Pressure Dynamics and Tutt Bryant Group Limited worked together to safely install a new 10t overhead crane. During the installation we had to overcome difficulties due to the limited head room for the crane to operate.
The installation was completed over a long weekend to limit the possible exposure to other contractors and personnel. It was also completed in a single shift to allow reduction in footprint in the shed if an emergency docking was required for a patrol boat.
This crane installation is now completed and is now in service.