We recently worked with a valued client to install a new wellhead to increase their production capacity.
Pressure Dynamics was responsible for supply, installation and commissioning of new tubing run which involved collaboratively working with the client’s wider team.
Our engineering team developed the bill of materials, installation, and commissioning work packs. Once finalised, Pressure Dynamics deployed specialist technicians and PD owned tooling to perform tube fabrication, installation, flushing and pressure testing of the new installation.
Pressure dynamics collaborated with our client and other subcontractors right from the initial planning phase ensuring all interfaces were appropriately captured during all phases of the project.